NYSE:DNR $ 2.17 +0.07 +3.33% Volume: 9,521,240 December 12, 2018
COsub2-sub-Pipelines

Greencore Pipeline. The 20-inch Greencore Pipeline in Wyoming is the first CO2 pipeline we constructed in the Rocky Mountain region. We plan to use the pipeline as our trunk line in the Rocky Mountain region, eventually connecting our various Rocky Mountain region CO2 sources to the Cedar Creek Anticline in eastern Montana and western North Dakota. The initial 232-mile section of the Greencore Pipeline begins at the ConocoPhillips-operated Lost Cabin gas plant in Wyoming and terminates at Bell Creek Field in Montana. We completed construction of this section of the pipeline in the fourth quarter of 2012 and received our first CO2 deliveries from the ConocoPhillips-operated Lost Cabin gas plant during the first quarter of 2013. During the first quarter of 2014, we completed construction of an interconnect between our Greencore Pipeline and an existing third-party CO2 pipeline in Wyoming, which enables us to transport CO2 from LaBarge Field to our Bell Creek Field.

2.17 +0.07 +3.33% Volume: 9,521,240 12/12/18
| Site Design by Eisenberg And Associates

All content included on this site, including all text, graphics, logos, and software, and the compilation of the components of this site, are the property of Denbury Resources Inc. and are protected by all applicable U.S. and international copyright laws. THE SITE AND ITS CONTENT MAY ONLY BE USED AS PERMITTED BY DENBURY RESOURCES INC. ON THE SITE; ALL OTHER USES, INCLUDING COPYING, DUPLICATION, REPRODUCTION, MODIFICATION, DISTRIBUTION, TRANSMISSION, REPUBLICATION, DISPLAY OR PERFORMANCE, IN WHOLE OR IN PART, OF THE CONTENT ON THIS SITE ARE STRICTLY PROHIBITED WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF DENBURY RESOURCES INC.