CCA Pipeline. The 16-inch CCA Pipeline was completed in 2021 under budget and ahead of schedule. This 105-mile pipeline transports CO2 from the Greencore Pipeline at the Bell Creek Field to our Cedar Creek Anticline EOR fields in eastern Montana and western North Dakota. First CO2 deliveries through the CCA Pipeline occurred in November of 2021.
Beaver Creek Pipeline. The Beaver Creek Pipeline in Wyoming was acquired by Denbury in 2021 in conjunction with the Wind River Basin EOR acquisition. This 46-mile pipeline delivers CO2 to the Big Sand Draw and Beaver Creek EOR fields.
Detailed Pipeline and Ownership Information Available Here.
All content included on this site, including all text, graphics, logos, and software, and the compilation of the components of this site, are the property of Denbury Inc. and are protected by all applicable U.S. and international copyright laws. THE SITE AND ITS CONTENT MAY ONLY BE USED AS PERMITTED BY DENBURY INC. ON THE SITE; ALL OTHER USES, INCLUDING COPYING, DUPLICATION, REPRODUCTION, MODIFICATION, DISTRIBUTION, TRANSMISSION, REPUBLICATION, DISPLAY OR PERFORMANCE, IN WHOLE OR IN PART, OF THE CONTENT ON THIS SITE ARE STRICTLY PROHIBITED WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF DENBURY INC.